Speed off site, certainty on site
Timber Frame
Factory manufactured panels and trusses erected quickly once foundations are ready. The frame package is led by design: supplier drawings, approvals and manufacture slots all sit on the critical path long before materials arrive.



Where projects get caught out
Lead times and approval stages control everything. We work backwards from the required on site date so the tender, selection and manufacture window is never compressed.
How we procure it
- Frame design, supplier drawing approvals and manufacture slots booked against the programme
- Trusses, joists, sheathing, membranes and ancillary timber packages measured and scheduled
- Lintels, cavity trays, fire barriers and fixings flagged as interface items, not afterthoughts
- Delivery sequenced to craneage and plot order, not just a date on a purchase order