24 HOUR BoQ

Your measured BoQ returned within 24 hours

P4HB 24-7

Your BoQ in 24 hours Ready for procurement

Stop waiting for quantities. Start making procurement decisions.

A BoQ should not be the end product. It should be the starting point for buying. P4HB 24-7 turns your drawings into a QS reviewed measured Bill of Quantities including material quantities.

You receive

  • ✓QS reviewed measured BoQ
  • ✓Material quantities included
  • ✓Assumptions, exclusions and qualifications

Where required, P4HB can take the measured information into live pricing, value engineering, procurement, call offs and delivery under a separately agreed scope.

Programme of Works

  • ✓Package dates, dependencies and milestones
  • ✓Lead time and scheduled order planning
  • ✓Sequenced against the construction programme
  • ✓Progress reporting against the build sequence

Contract Review

  • ✓Clauses reviewed for commercial exposure
  • ✓Key risks and obligations highlighted
  • ✓Issues identified before signature
  • ✓Support through to agreement

Compliance Documents

  • ✓RAMS and method statements
  • ✓H&S plans and COSHH assessments
  • ✓Editable, branded outputs
  • ✓Prepared from the project information provided

Technology accelerated • QS reviewed • Procurement led • UK wide

Example P4HB output.

Procurement and project planning

The engine at the front of your development

The measured BoQ is only the beginning

P4HB gives developers, investors, house builders and contractors control of cost, procurement, programme and supply chain risk much earlier in the project.

Upload your construction drawings and project information for one detailed, QS reviewed measured Bill of Quantities including material quantities. Eligible projects will be returned within 24 hours, subject to review and acceptance of the drawings and confirmation of payment.

Where required, P4HB can take the measured information into live pricing, value engineering, procurement, call offs and delivery under a separately agreed scope.

The 24 hour period starts only after the drawings have been reviewed and accepted and payment has been confirmed.

From BoQ to delivery

Your BoQ is only the beginning

Measure it once. Use it all the way through procurement.

P4HB turns measured quantities into live pricing, value engineering, procurement and delivery, so your project can move from drawings to buying without starting again.

Measure

Turn drawings into a QS reviewed measured BoQ including material quantities.

Live Price

Take measured quantities straight to market for current supplier pricing.

Value Engineer

Compare systems, specifications and suppliers before design decisions become expensive.

Procure

Normalise quotations, control scope and place the right packages.

Programme

Align procurement, lead times and cash commitments with the construction programme.

Deliver

Manage scheduled orders, logistics and site delivery against the build sequence.

Why P4HB

Find the risk before it costs you

Most procurement problems start long before the order is placed.

By the time a package is late, over budget or missing scope, the real mistake was often made weeks or months earlier. P4HB gets involved before that happens. We bring cost, programme, supply chain and procurement information together early, so you can see where the project is exposed before money is committed.

Cost drift

Know where the budget is moving before it becomes a problem.

Missing scope

Expose gaps, exclusions and assumptions before they become variations.

Supplier risk

Know who can supply, when they can supply and where the lead time risk sits.

Programme pressure

Work backwards from site dates so procurement does not become the reason the build slips.

Cash flow pressure

Align procurement commitments with funding and lender drawdowns before orders are placed.

Poor buying decisions

Compare scope, price, programme and risk properly, not just the cheapest number on a quote.

If you are about to commit money, place an order or lock in a design decision, speak to us first.

Protect margin before construction starts

Margin is lost before the first order is placed

Late buying, incomplete scopes, missed interfaces and poorly compared quotations all erode profit long before they show up in the final account.

P4HB gets involved earlier.

We measure the works, expose the gaps, test the market, compare the options and align procurement with programme and cash flow before major commitments are made.

Find the risk early. Protect the margin. Procure with control.

What you receive

Your measured BoQ including material quantities

Measured BoQ

A package by package BoQ setting out the measured works, units, sizes and specifications where supplied.

Material quantities

Material quantities are included within the measured BoQ and organised for supplier pricing.

Clear package structure

Measured information is organised around the packages used to plan procurement.

Assumptions included

Assumptions, exclusions and measurement caveats are recorded within the measured BoQ.

Traceable measurement basis

Drawing references and the measurement basis are shown against the relevant items.

QS reviewed output

The measured BoQ is reviewed before issue so the information can move forward.

Before you commit the next package, let us show you where the project is exposed.

Specimen output

Measured BoQ including material quantities

Illustrative format only
Cost codeCategorySubcategoryDescription (sizes / spec)QtyUnitSource / basisNotes
2.10.010SubstructureFoundationsMass concrete trench fill, C25/30, 600mm wide x 1000mm deep42.6m³Synthetic sample ref SP-101 (illustrative)Depth assumed pending ground investigation
2.10.040SubstructureBelow-ground wallingTrench block 440 x 215 x 100mm to underside of DPC68.4m²Synthetic sample ref SP-101 (illustrative)Not provided
3.20.010SuperstructureExternal wallsFacing brickwork 102.5mm, stretcher bond, sand/cement mortar184.2m²Synthetic sample ref SP-104 (illustrative)Brick type to be confirmed by specification
3.20.020SuperstructureExternal wallsThin-joint blockwork inner leaf 100mm, 7.3N/mm²184.2m²Synthetic sample ref SP-104 (illustrative)Not provided
3.20.060SuperstructureInsulationFull-fill cavity insulation 100mm mineral wool, 0.032 W/mK184.2m²Synthetic sample ref SP-104 (illustrative)Estimated quantity, u-value calculation not supplied
3.40.010SuperstructureRoof structurePre-fabricated trussed rafters at 600mm centres, 9.2m span36nrSynthetic sample ref SP-108 (illustrative)Truss design by supplier
3.40.050SuperstructureRoof coveringConcrete interlocking tile, 420 x 330mm, on battens and membrane146.8m²Synthetic sample ref SP-108 (illustrative)Not provided
4.10.020Internal finishesWall finishesPlasterboard 12.5mm on dabs, skim finish412.5m²Synthetic sample ref SP-112 (illustrative)Not provided
5.10.030OpeningsWindowsDouble-glazed casement, 1200 x 1050mm, anthracite grey frame8nrSynthetic sample ref SP-116 (illustrative)From window schedule where supplied
6.10.010External worksHard landscapingBlock paving 200 x 100 x 50mm on Type 1 sub-base74.0m²Synthetic sample ref SP-120 (illustrative)Estimated quantity, site plan extent indicative

Material quantities form part of the measured BoQ. The separate view below demonstrates how the same quantities can be organised for suppliers.

Services

Your BoQ is the starting point and this is where P4HB adds value

Once the project is measured, we can take it further into pricing, programming, commercial review, compliance and procurement support.

Choose the support you need. Add only what creates value for the project.

Core service

Measured BoQ

A QS reviewed measured Bill of Quantities including material quantities.

  • Measured BoQ setting out the works
  • Material quantities included within the BoQ
  • Cross referenced to the drawings supplied
  • Assumptions, exclusions and caveats recorded within the BoQ
POA, site dependentStart my BoQ
Separately scoped

Live Pricing

Take the measured BoQ into the supplier market as a separately scoped service.

  • Current supplier enquiries
  • Comparable quotations
  • Scope and exclusions checked
  • Buying decisions supported by live market information
POA, site dependentLive price my BoQ
Separately scoped

Programme of Works

Make sure procurement follows the build, not the other way round.

  • Package dates, dependencies and milestones
  • Lead time and scheduled order planning
  • Sequenced against the construction programme
  • Progress reporting against the build sequence
POA, site dependentBuild my programme
Separately scoped

Price Back

Send us your BoQ. Get it returned priced and commercially structured.

  • Quotations checked against the drawings
  • Labour and material separated
  • Pricing returned in your own format
  • Clearer basis for review and comparison
POA, site dependentPrice my bill
Separately scoped

Contract Review

Know what you are signing before the risk lands with you.

  • Clauses reviewed for commercial exposure
  • Key risks and obligations highlighted
  • Issues identified before signature
  • Support through to agreement
POA, site dependentReview my contract
Separately scoped

Compliance Documentation

Turn project information into the documents your site team needs.

  • RAMS and method statements
  • H&S plans and COSHH assessments
  • Editable, branded outputs
  • Prepared from the project information provided
POA, site dependentPrepare my documents

Not every project needs every service.

P4HB can support a single package, a single commercial issue or the entire procurement journey.

Your client portal

Track your projects in one place

Create your secure client account to see the projects P4HB has assigned to you, including project status, recorded value, issued BoQ documents, drawings, updates and quotations.

When P4HB approves a supplier quotation for windows, doors, bathrooms, kitchens, stairs, roof lights, structures or roof materials, it can be issued directly to the relevant project dashboard. Internal buying information and unapproved quotations remain private.

  • See all assigned projects and their recorded values
  • Download issued documents and approved quotations
  • Track revisions, updates and project activity
  • Ask P4HB about live pricing, value engineering and wider support
Client login
P4HB client dashboard showing the Talk to P4HB services, project figures and reportsP4HB project dashboard for St Andrews Court showing project value, received quotations, submitted quotation value, key elements addressed and coverage charts

Who we work with

Built for the people who carry the risk when procurement goes wrong

P4HB gives each part of the project team clearer cost, scope, programme and supply chain information before major commitments are made.

Developers

Protect margin before procurement decisions start locking the project in.

Investors

See where cost, scope and procurement risk sit before more capital is committed.

Funders

Improve visibility around cost, drawdown requirements and procurement exposure.

House Builders

Add procurement capability without carrying the overhead of a full in house buying team.

Main Contractors

Strengthen estimating, package buying and supplier comparison when workload is high.

Project Managers & Design Teams

Bring procurement and commercial reality into design decisions earlier.

Architects

Give clients clearer measured information before design changes become expensive.

Self Build

Know what the project is likely to require before committing to trades and suppliers.

Builders

Price work properly, reduce missed scope and buy materials at the right time.

Subcontractors

Price packages with clearer quantities and fewer assumptions.

Different roles. Same problem: poor information creates expensive decisions.

P4HB gives the project team something they can actually price, compare, programme and procure from.

Talk to P4HB

Live market pricing

Don’t rely on yesterday’s rates for tomorrow’s build

Your BoQ tells you the quantity. The market tells you the cost.

Once your quantities are complete, P4HB takes the measured packages to the supply chain, gathers current supplier quotations, normalises scope and builds a procurement master sheet.

Because the lowest number is not always the lowest risk.

Start my BoQ
Price
Scope
Specification
Lead times
Availability
Payment terms
Delivery requirements
Exclusions
Commercial risk

We compare the whole offer, not just the price.

Value engineering

Don’t save £50k on one package and lose £100k somewhere else

A cheaper package can make the project more expensive. That immediately creates tension.

Changing a construction system can affect structure, foundations, loading, wall thicknesses, façade, thermal performance, fire strategy, programme, cash flow and supplier responsibility.

P4HB tests the connected effects before an alternative is treated as a saving.

Value Engineer My Project

We compare more than price:

Construction system
Specification
Supplier options
Lead times
Programme
Cash flow
Design responsibility
Interface risk
Single package commercial impact
Whole project commercial impact

Value engineering only works if the saving survives the whole project.

Select a schedule and click the image to inspect the measured detail

Technology + procurement expertise

Technology gets us there faster while procurement expertise guides the decisions

P4HB uses technology to accelerate measurement, information management and project workflows, while procurement decisions remain in experienced hands.

These working schedules show how project information can be structured by plot, level, location and item. This gives the team a clearer basis for checking scope, coordinating specifications and preparing packages for supplier enquiry.

Our team combines quantity surveying, construction knowledge, supplier relationships and commercial management to turn project information into decisions that can actually be implemented on site.

Technology accelerates the information and P4HB turns it into procurement strategy

Door schedules

Door references, locations, descriptions and performance requirements are organised in one traceable schedule.

Ironmongery schedules

Each opening is coordinated with the required hardware so package quantities can be checked before supplier enquiry.

Window reveal schedules

Measured returns, lengths, depths and locations are recorded to support accurate quantities and procurement planning.

Build methods

Procurement changes with the build method

Explore build methods

P4HB 24-7 measured BoQ

Clear starting fees for measured information

The prices below cover the P4HB 24-7 BoQ service. Live supplier pricing, value engineering, procurement management, delivery management and wider pre construction services are quoted separately based on project size and scope and are not included within this price.

Starting prices are subject to drawing and scope review. VAT shown at 20% for illustration. If the wrong project type is selected, we will confirm the difference to pay or issue a refund.

Frequently asked questions

The best time to control procurement is before the money is committed

Start with your drawings, cost plan or live project

P4HB helps you establish the right procurement route before design, programme, specification and supply chain decisions become expensive to change.

Need measured quantities fast?

Eligible projects will be returned within 24 hours, subject to review and acceptance of the drawings and confirmation of payment.