Private product preview, no live payments or customer submissions
Bridgford, West Bridgford, Nottingham
All projects

Completed

Bridgford

West Bridgford, Nottingham ยท Tang Development

Project case study

Project
Bridgford
Location
West Bridgford, Nottingham
Client
Tang Development
Development
A former public house redeveloped as a mixed-use scheme: two commercial units with seven apartments above.
P4HB role
We started supporting Tang Development with building materials procurement and project management in February 2024 for a project in London. This Nottingham contract, alongside their development at Melton Road, further embeds our role as their outsourced procurement partner. We source and deliver the following packages.
Procurement challenge
Not published.
What P4HB did
We started supporting Tang Development with building materials procurement and project management in February 2024 for a project in London. This Nottingham contract, alongside their development at Melton Road, further embeds our role as their outsourced procurement partner. We source and deliver the following packages.
Commercial / programme outcome
Completed. Further commercial or programme outcomes are not published unless stated in the project narrative.
The former Black Pearl public house ahead of the redevelopment.
The former Black Pearl public house ahead of the redevelopment.
Street elevation scaffolded, with first floor blockwork progressing.
Street elevation scaffolded, with first floor blockwork progressing.
Front elevation scaffolded with debris netting in place.
Front elevation scaffolded with debris netting in place.
Street elevation progressing behind the pedestrian barrier.
Street elevation progressing behind the pedestrian barrier.
Internal strip out, with structural steel and joist hangers exposed.
Internal strip out, with structural steel and joist hangers exposed.
Internal blockwork walls under construction.
Internal blockwork walls under construction.
First floor steel beams landed on the blockwork structure.
First floor steel beams landed on the blockwork structure.
Structural steel frame installed at first floor.
Structural steel frame installed at first floor.
Steel framing over the new apartment layouts.
Steel framing over the new apartment layouts.
Steel and blockwork interfaces completed ahead of the floor build up.
Steel and blockwork interfaces completed ahead of the floor build up.

Start with quantities. Then let us price and procure them