Eastdown Park, Lewisham, London
All projects

On site

Eastdown Park

Lewisham, London · Sort Projects · £15,000,000 project value

Project case study

Project
Eastdown Park
Location
Lewisham, London
Client
Sort Projects
Development
A concrete frame residential development in Lewisham, currently on site, with P4HB estimating the scheme and supplying selected packages as the build progresses.
P4HB role
P4HB estimated the project and has gone on to supply selected packages as the build moves forward. Packages supplied to date include the following.
Procurement challenge
Not published.
What P4HB did
P4HB estimated the project and has gone on to supply selected packages as the build moves forward. Packages supplied to date include the following.
Commercial / programme outcome
On site. Further commercial or programme outcomes are not published unless stated in the project narrative.
The concrete frame at Eastdown Park with brickwork starting on the lower floors.
The concrete frame at Eastdown Park with brickwork starting on the lower floors.
Masonry following the frame, with block and brick delivered into the working area.
Masonry following the frame, with block and brick delivered into the working area.
The corner elevation from the street, with the mortar silo in place.
The corner elevation from the street, with the mortar silo in place.
Eastdown Park from the street with the tower crane above.
Eastdown Park from the street with the tower crane above.
Scaffolding around the frame as the elevations move up.
Scaffolding around the frame as the elevations move up.
The site from the street, framed by the terraced houses behind the hoarding.
The site from the street, framed by the terraced houses behind the hoarding.
Blockwork rising across the rear elevation.
Blockwork rising across the rear elevation.
Drylining and fire stopping materials delivered and stored ready for call off.
Drylining and fire stopping materials delivered and stored ready for call off.
The tower crane lifting materials to the upper floors.
The tower crane lifting materials to the upper floors.
Aggregates staged at the hoarding with the mortar silo ready.
Aggregates staged at the hoarding with the mortar silo ready.
The street elevation with materials landed and stored safely off the highway.
The street elevation with materials landed and stored safely off the highway.
P4HB on site checking deliveries and the next package.
P4HB on site checking deliveries and the next package.
Insulation and timber staged at the rear of the site.
Insulation and timber staged at the rear of the site.
A pallet of blocks arriving by crane.
A pallet of blocks arriving by crane.
First fix services running through the apartments ahead of the drylining.
First fix services running through the apartments ahead of the drylining.
Plasterboard delivered into the building, stacked and ready.
Plasterboard delivered into the building, stacked and ready.
Insulation boards craned in and stored on the scaffold landing.
Insulation boards craned in and stored on the scaffold landing.